The Inside Story of the Robertson Tunnel, Part 1: Construction

The Inside Story of the Robertson Tunnel, Part 1: Construction

The Inside Story of the Robertson Tunnel, Part 1: Construction The Robertson Tunnel is a marvel.  This tunnel through the West Hills – allowing MAX to extend from Portland to Beaverton and Hillsboro — is nearly three miles long and drilled through challenging and...
How Type 2 MAX Cars Pioneered More Accessible Light Rail in America

How Type 2 MAX Cars Pioneered More Accessible Light Rail in America

How Type 2 MAX Cars Pioneered More Accessible Light Rail in America Every MAX train contains a major innovation in light rail that was pioneered right here in Oregon. And you probably walk over it without even realizing it.  We’re talking about the low-floor light...